首页 > 过刊浏览>2024年第卷第9期 >2024(9):834-838. DOI:10.3969/j.issn.2097-2172.2024.09.010
上一篇 | 下一篇

镜铁山高寒矿区排水渠改造工程防结冰措施分析及断面设计优化

Analysis of Anti-freezing Measures and Cross-section Design Optimization for the Drainage Channel Reconstruction Project in the Cold Mining Area of Jingtie Mountain

发布日期:2024-11-11